CAPEL CIVIC PRECINCT DEVELOPMENT STAGE 3

Bnd by Capel Dr, Forrest, Roe & Buchanan Rds, CAPEL, Western Australia, Australia. 6271

Estimated Value $2,709,800 million

Development Civic precinct development - stage 3

Main Category Entertainment

  • Early Planning
  • Planning
  • Tenders
  • Construction

About This Project


Clearing & disposal of vegetation & trees; Clearing & disposal of existing infrastructure as shown in the drawings & as specified by the Principal; Removal & disposal of unwanted debris/rubbish; Stripping & disposal of topsoil; Earthworks for drainage structures & to achieve finished levels; Earthworks & preparation of landscaped areas & building areas; Supply & installation of stormwater drainage pipeline & structures; Preparation of road subgrade, supply & installation of road pavement materials, sealing & asphalt surfacing; Supply & installation of concrete kerbs & footpaths, paved areas & fencing; Supply & installation of skateable elements as shown in the drawings & as specified by the Principal; Supply & installation of two pre-fabricated shelters, two BBQs, two drinking fountains, three bike racks, four bins, two bench seats, two picnic setting under the pre-fabricated shelters; Supply & installation of a terraced amphitheatre; Supply & installation of a Stage & associated Stage Shelter; Supply & installation of a large shelter at north of the playground as shown on the drawings; Supply & installation of shade sail & post over the playground area; Supply & installation of playground equipment; Relocation of existing playground equipment & the supply & installation of all abilities play equipment & nature play equipment (to be conducted by a specialist supply organisation such as ForPark); Supply & installation of irrigation; -Supply & installation of mulch, turf, shrubs & plants; -Supply & installation of line marking & signs; Supply & installation of water supply lines, including all plumbing pipework & fittings; -Supply & installation of underground electrical cabling & lighting; Supply & installation of market power box; Supply & installation of Site Main Switch Board(SMSB) to remove & upgrade the existing SMSB at Buchannan Road; -Supply & installation of conduit & pits for future CCTV cabling.

Full information about CAPEL CIVIC PRECINCT DEVELOPMENT STAGE 3 and other development projects are available with the Cordell Connect subscription

Subscription includes
  • Full access to over 160,000 development projects
  • Over 63,000 industry contacts
  • 1500 hours of research every week
Further Information

Details available with subscription

Request Demo
Type CIVIC PRECINCT DEVELOPMENT - stage 3
Dev Type Renovation
Status Commenced
Stage COMPLETED
Ownership 4
No. Units 0.000
No. Floors 0.000
Commencement Date 01/02/18
Completion Date 29/06/18
First Reported Date 24/08/11

Project Information

Roles

Get full contact details for those working on the project at this stage

Landscape Designer
Engineer
Project Manager
Developer
Paul F Sheedy CEO
Tendering Authority
Builder
Tenderer

Get full contact details for 1 tenderers on this project

Tenderer

Other Projects

Stay Connected with Cordell Connect

Cordell Connect tracks the lifespan of all Construction, Civil & Mining projects across Australia, naming key roles as they are appointed. This allows you to target and track projects & companies you would like to get involved with and is your one-stop shop for target sales leads in construction.