GUNNEDAH SEWERAGE TREATMENT PLANT

Boggabri Rd, GUNNEDAH, New South Wales, Australia. 2380

Estimated Value $6 million

Development Sewerage treatment plant - upgrade

Main Category Public utilities

  • Early Planning
  • Planning
  • Tenders
  • Construction

About This Project


Proposed upgrade of existing sewerage treatment plant. Scope of work includes: A septage reception facility. An inlet lift pump station with bypass weirs and inlet flow measurement. An inlet works with automatic fine screens, screenings washing and dewatering, grit removal, grit washing and dewatering, quality monitoring & flow distribution. A humus return pump station. An above ground anaerobic digester with digester mixing, pipework & valves. A sludge transfer pump station. A biosolids dewatering facility with feed averaging tank, sludge feed pumps, polymer dosing system, mechanical dewatering system, conveyor and filtrate return pump station. An effluent transfer flow meter. Site civil works including - construction earthworks and drainage; amenities building; access road; yard pipework; stairs, access ways & handrails; service water reticulation system. Refurbishment of the existing Imhoff tank, primary sedimentation tanks & trickling filters Electrical and control work upgrade including: a new switchroom including a new site MCC with external generator connection point; new PLC, site SCADA system, RTU, and local control stations; removal of existing low-voltage power lines that traverse the site new telephone incomer; site lighting; building smoke detection & security system. Decommissioning of redundant existing assets including: inlet works; the lift pump station; the below ground digesters including digester dry well and pump house; the sludge drying beds & the treated effluent transfer pumping station switchboard

Full information about GUNNEDAH SEWERAGE TREATMENT PLANT and other development projects are available with the Cordell Connect subscription

Subscription includes
  • Full access to over 160,000 development projects
  • Over 63,000 industry contacts
  • 1500 hours of research every week
Further Information

Details available with subscription

Start A Free Trial
Type SEWERAGE TREATMENT PLANT - upgrade
Dev Type New
Status Firm
Stage CONTRACT LET
Ownership 4
No. Units 0.000
No. Floors 0.000
Commencement Date 20/03/17
Completion Date 31/05/17
First Reported Date 09/07/14

Project Information

Roles

Get full contact details for those working on the project at this stage

Geotechnical Consultant
Matt Rowbotham
Consultant
Developer
Kevin Sheridan
Tendering Authority
Kevin Sheridan
Design Engineer
Contractor
Tenderer

Get full contact details for 4 tenderers on this project

Tenderer
Tenderer
Tenderer
Tenderer

Other Projects

Stay Connected with Cordell Connect

Cordell Connect tracks the lifespan of all Construction, Civil & Mining projects across Australia, naming key roles as they are appointed. This allows you to target and track projects & companies you would like to get involved with and is your one-stop shop for target sales leads in construction.