PUTKATJA & UMUWA (APY LANDS) ROADWORKS

Main access road between Putkatja & Umuwa, ., South Australia, Australia. 5999

Estimated Value $21.407 million

Development Roadworks

Main Category Civil engineering

  • Early Planning
  • Planning
  • Tenders
  • Construction

About This Project


The Principal invites tenders for the reconstruction of the main access road between Putkatja & Umuwa in the Anangu Pitjantjatjara Yankunytjatjara (APY) Lands. The work has been categorised into Defined & Provisional work. Provisional work is work undertaken at the sole discretion of the Superintendent, who will provide written notification to the Contractor if this work is required. Defined Work: The work consists of the following: 1) Removal & disposal of vegetation to designated sites; 2) Stripping of topsoil to a depth of 100mm; 3) Excavate all windrow material within the CAZ to natural surface level; 4) Load & Haul additional fill material, where required, from nominated sites; 5) Creating side drains & shaping of the existing road formation in preparation for laying the sheeting material; 6) Load & Haul of Pavement Material from existing approved local borrow pit; 7) Sheet the completed formation works; 8) Treatment of waterway crossings; 9) Application of SA 10-7mm Primer seal bituminous surfacing; 10) Maintenance of all access tracks to pits & bores; 11) Construction works shall match in with existing side roads as per design; 12) Pavement marking; 13) Installation of guide posts & signs; 14) Installation of Cattle Grid & new fence to match into existing. During the course of the work, the Tenderer shall not leave the site to undertake work outside this tender without the approval of the Superintendent. Provisional Work: The Provisional Work consists of the reconstruction & bituminous sealing of the Umuwa Town Streets. The works consist of: a) Levelling the existing surface of the roads & carparks; b) Construction of a 150mm pavement layer over the formed surface, whilst still ensuring water runoff; c) Allowing water to be free draining over the new surface (the existing surface flows to the SE); d) SA 10-7mm Primer Seal; e) Installation of Pavement Marking; f) Match water runoff into decommissioned road to allow water to flow away. Supply of Materials: The Principal will supply: a) 430,000Tonne Pavement material for subbase & base layers, with: i) 420,000T stockpiled at Mystery Pit; & ii) 10,000T at Umuwa Pit to be used in the subbase course layer only. Any additional material will be provided by the Principal in accordance with the Schedule of Rates for Variations b) Signs & Guideposts; c) Cattle grids. The Tenderer shall collect & load signs, guideposts & cattle grids from the DPTI Depot, Plover Rd, Marla. The Tender shall contact either of the following to arrange collection: Karl Dowling, mobile: 0427 254 002; or Steve Scott, mobile: 0427 600 358. The Tenderer shall supply all other materials.

Full information about PUTKATJA & UMUWA (APY LANDS) ROADWORKS and other development projects are available with the Cordell Connect subscription

Subscription includes
  • Full access to over 160,000 development projects
  • Over 63,000 industry contacts
  • 1500 hours of research every week
Further Information

Details available with subscription

Start A Free Trial
Type ROADWORKS
Dev Type New
Status Commenced
Stage CONSTRUCTION
Ownership 3
No. Units 0.000
No. Floors 0.000
Commencement Date 30/01/17
Completion Date 30/11/17
First Reported Date 21/10/15

Project Information

Roles

Get full contact details for those working on the project at this stage

Tendering Authority
Steve Scott
Developer
Braydon Ames
Contractor
Tenderer

Get full contact details for 19 tenderers on this project

Tenderer
Tenderer
Tenderer
Tenderer
Tenderer
Tenderer
Tenderer
Tenderer
Tenderer
Tenderer
Tenderer
Tenderer
Tenderer
Tenderer
Tenderer
Tenderer
Tenderer
Tenderer
Tenderer

Other Projects

Stay Connected with Cordell Connect

Cordell Connect tracks the lifespan of all Construction, Civil & Mining projects across Australia, naming key roles as they are appointed. This allows you to target and track projects & companies you would like to get involved with and is your one-stop shop for target sales leads in construction.