GULLEN SOLAR FARM

131, 250 & 280 Storriers Ln, BANNISTER, New South Wales, Australia. 2580

Estimated Value $25 million

Development Solar farm

Main Category Public utilities

  • Early Planning
  • Planning
  • Tenders
  • Construction

About This Project


Use of land, construction of buildings and carrying out of works for a solar farm for the purpose of electricity generating works. The project would consist of a large field of solar PV panels installed on support frames and connected by wiring to inverters. The inverters convert direct-current (DC) electricity to alternating current (AC) electricity. Underground AC cables would then connect the output of the solar farm to the existing wind farm electricity substation and grid connection point. The solar farm would produce approximately 22,000 megawatt-hours of clean renewable energy each year. Construction works involve site establishment including fencing, earthworks, set out & construction of access roads & sediment & erosion controls; installation of foundations (excavation and concrete footings) or driven piles. Installation of underground cabling. Assembly of the panel frames and mounts. Installation of the PV panels. Installation of the inverter/transformer units, including pouring of concrete pads for inverter/transformer units. Installation of low voltage cabling and combiner boxes. Construction of a spare parts storage shed. Substation works to connect the solar farm to the existing Gullen Range Wind Farm. Removal of temporary construction facilities and completion of restoration works. Solar panel arrays including up to 42,500 solar panels. 4 power conversion blocks (inverters, transformers, switchgear & fans). Storage building. Water storage tank. perimeter security fencing. Access roads. underground cabling.

Full information about GULLEN SOLAR FARM and other development projects are available with the Cordell Connect subscription

Subscription includes
  • Full access to over 160,000 development projects
  • Over 63,000 industry contacts
  • 1500 hours of research every week
Further Information

Details available with subscription

Start A Free Trial
Type SOLAR FARM
Dev Type New
Status Commenced
Stage CONSTRUCTION
Ownership 1
No. Units 0.000
No. Floors 0.000
Commencement Date 24/10/16
Completion Date 28/07/17
First Reported Date 03/02/16

Project Information

Roles

Get full contact details for those working on the project at this stage

Acoustic Engineer
Ima Fricker
EIS Consultant
Brooke Marshall
Developer
Landscape Architect
Andy Homewood
Contractor

Other Projects

Stay Connected with Cordell Connect

Cordell Connect tracks the lifespan of all Construction, Civil & Mining projects across Australia, naming key roles as they are appointed. This allows you to target and track projects & companies you would like to get involved with and is your one-stop shop for target sales leads in construction.