ST FRANCIS OF ASSISI SCHOOL

62-64 Gordon St, PADDINGTON, New South Wales, Australia. 2021

Estimated Value $4.4 million

Development School - 4 storey - altns & addns

Main Category Education

  • Early Planning
  • Planning
  • Tenders
  • Construction

About This Project


Alterations & additions to existing including temporary change of use of the residency at 62 Gordon St for school office use, internal and external alterations. Demolition of the internal fabric of the amenities building to provide internal vertical circulation, demolition of the buildings roof and installation of new fourth storey link building, demolition of existing bridges that connect the amenities building and main school building. Construction of a infill between amenities building & main school building at all levels Modify internal spaces on first & second floors of main school building to provide open plan learning environment, including demolition of significant portion of north western facade. Demolition of the existing external stair. Enclosure of verandah. Reconfigure staff and administrative areas on ground floor. Construct new visitor entrance foyer. Utilise existing roof top, comprising a studio (covered outdoor learning area and associated facilities), amenities, 2 new stairs, lift. Alterations to existing pedestrian entry, new single storey amenities building. installation of 2 storey demountable buildings for the temporary use during building works to the school. Internal alterations to existing library building. Profiled metal sheeting, aluminium louvres with glazing behind, CFC cladding, existing timber windows to be refurbished or replaced, aluminium powdercoated windows with louvres.

Full information about ST FRANCIS OF ASSISI SCHOOL and other development projects are available with the Cordell Connect subscription

Subscription includes
  • Full access to over 160,000 development projects
  • Over 63,000 industry contacts
  • 1500 hours of research every week
Further Information

Details available with subscription

Request Demo
Type SCHOOL - 4 storey - altns & addns
Dev Type Addition
Status Commenced
Stage MORE THAN HALF WAY THROUGH BUT NOT YET COMPLETED
Ownership 1
No. Units 0.000
No. Floors 2998.000
Commencement Date 12/06/17
Completion Date 16/02/18
First Reported Date 04/05/16

Project Information

Roles

Get full contact details for those working on the project at this stage

Architect
Bldg Certifier/Bldg Surveyor
Heritage Architect
Quantity Surveyor
Hydraulic Engineer
Developer
Town Planner
Sandra Robinson
Builder

Other Projects

Stay Connected with Cordell Connect

Cordell Connect tracks the lifespan of all Construction, Civil & Mining projects across Australia, naming key roles as they are appointed. This allows you to target and track projects & companies you would like to get involved with and is your one-stop shop for target sales leads in construction.