MOSMAN COUNCIL ROADWORKS

Balmoral Reserve, MOSMAN, New South Wales, Australia. 2088

Estimated Value $2 million

Development Roadworks

Main Category Civil engineering

  • Early Planning
  • Planning
  • Tenders
  • Construction

About This Project


Component One - Concrete Promenade Replacement: Saw cut existing concrete promenade (nominal 150mm off piers) in a straight line, demolish, remove and dispose of existing infrastructure as appropriate off-site to an approved tipping facility. Supply, form and pour 130mm reinforced concrete footpath to match the existing width. Establish the surface design of exposed and polished aggregate to ensure high end finish quality. Apply Parchem Aegis MSP to remaining slab surface. Slip resistance category of P5 must be achieved. Component Two - Concrete Seating Works South End of Balmoral Beach Reserve: Where applicable, demolish and remove existing timber retaining structures and koppers log fencing and earthworks for foundation as appropriate off-site to an approved tipping facility. Supply, form and pour concrete seating base. Supply and install pre-cast concrete seating. Supply and install other types of seating. Supply and install shielding for the bins. Supply and install electrical conduits. Component Three - Beach Access Stairs: Remove and dispose of all existing hand rails. Saw cut existing stairs, demolish, remove and dispose as appropriate off-site to an approved tipping facility. Supply, form and pour concrete stairs. Supply and install hand rails. Supply and install nosing strips. Component Four - Walkways: Saw cut existing footpath/paving, demolish, remove and dispose as appropriate off-site to an approved tipping facility. Supply, form and pour concrete pathways. Supply, form and pour kerb and gutter where applicable. Supply and install expansion and constriction joins as required.

Full information about MOSMAN COUNCIL ROADWORKS and other development projects are available with the Cordell Connect subscription

Subscription includes
  • Full access to over 160,000 development projects
  • Over 63,000 industry contacts
  • 1500 hours of research every week
Further Information

Details available with subscription

Start A Free Trial
Type ROADWORKS
Dev Type New
Status Commenced
Stage CONSTRUCTION
Ownership 4
No. Units 0.000
No. Floors 0.000
Commencement Date 20/04/17
Completion Date 08/09/17
First Reported Date 15/02/17

Project Information

Roles

Get full contact details for those working on the project at this stage

Developer
Tendering Authority
Indira Chandrawansa
Designer
Contractor

Other Projects

Stay Connected with Cordell Connect

Cordell Connect tracks the lifespan of all Construction, Civil & Mining projects across Australia, naming key roles as they are appointed. This allows you to target and track projects & companies you would like to get involved with and is your one-stop shop for target sales leads in construction.