GORGE ROAD RETAINING WALLS

Gorge Rd (between Paracombe &, CUDLEE CREEK, South Australia, Australia. 5232

Estimated Value $150,000

Development Retaining walls (3)

Main Category Civil engineering

  • Early Planning
  • Planning
  • Tenders
  • Construction

About This Project


The Principal invites tenders for provision of the following: Description of Works: The recent wet winter has compromised sections of road embankments on Gorge Road. The Contract is divided into separate portions to account for the different construction considerations & their distance apart. Separate Portion A: A scour has occurred below the road embankment located at MM184 on Gorge Road, approximately 800m North of Torrens Hill Road (Site 3). The scour was caused by a high river level in the adjacent River Torrens. Gabions must be constructed to retain the road & shotcrete must be placed to repair minor erosion. Access along Gorge Road to the public must be retained with minimum one lane open under contra-flow. The Contractor is to minimise environmental impacts to the River Torrens which includes machinery in the river bed. Separate Portion B: Sites 1 & 2 are located at MM24.185 & MM24.67 respectively on Gorge Road, approximately 800m East of Cudlee Creek Road. A recent wet winter & fallen trees have caused instability below the road embankment & requires a retaining wall. A concrete footing & 3m concrete block wall must be constructed as at each site. The Contractor may close Gorge Road for the construction of these 2 walls however, the duration of the road closure must be minimised. DPTI require minimum 7 days notice before closing Gorge Road in order to notify local residents. The Contractor shall provide VMS advance notice at either end of the closure 7 days prior to closing Gorge Road.

Full information about GORGE ROAD RETAINING WALLS and other development projects are available with the Cordell Connect subscription

Subscription includes
  • Full access to over 160,000 development projects
  • Over 63,000 industry contacts
  • 1500 hours of research every week
Further Information

Details available with subscription

Start A Free Trial
Type RETAINING WALLS (3)
Dev Type New
Status Commenced
Stage CONSTRUCTION
Ownership 3
No. Units 0.000
No. Floors 0.000
Commencement Date 25/06/17
Completion Date 31/07/17
First Reported Date 19/04/17

Project Information

Roles

Get full contact details for those working on the project at this stage

Developer
Shane Wynne
Tendering Authority
James Crisersa
Contractor
Tenderer

Get full contact details for 3 tenderers on this project

Tenderer
Tenderer
Tenderer

Other Projects

Stay Connected with Cordell Connect

Cordell Connect tracks the lifespan of all Construction, Civil & Mining projects across Australia, naming key roles as they are appointed. This allows you to target and track projects & companies you would like to get involved with and is your one-stop shop for target sales leads in construction.