NORMANBY CAR WASH FACILITY (NCWF)

., NORMANBY, Queensland, Australia. 4059

Estimated Value $7.043 million

Development Rail corridor/car wash building

Main Category Industrial

  • Early Planning
  • Planning
  • Tenders
  • Construction

About This Project


Normanby Car wash Facility - Rail Corridor & car wash building upgrades. Project will proceed in 4 work packages. Package A - Rail track alignment, OHLE and signalling; these works will be completed by the Principal & the scope included within this package includes: decommissioning of redundant rail systems and track infrastructure; realignment of track and relocation of OHLE & signal infrastructure at Roma Street end of the facility to accommodate the security fencing; rail track alignment and track structure 20m either side of the building (including ground improvement works and reinstating asphalt hyrail pad); train driver access platforms including stopping markers; capping layer; rail replacement within the building; signalling upgrades & CCTV cameras. Package B Civil Works (rail corridor) - demolition of nominated existing track services; demolition of existing rail corridor fencing; formation/earthworks widening; drainage; slope stabilisation (soil nails and shotcrete). Package C - rail corridor & car wash building upgrades - scope of work includes: rail corridor - train driver access pads; full perimeter security fencing, including automatic train gates; security lighting & CCTV along the rail corridor including all pits & conduits (excluding CCTV cameras); staff security fencing (car park and entrances to facility), including gates. Car wash building - building structural work; replacement of selected building services; cosmetic works and staff amenity improvements & track steel support system within facility; power supply -11kV RMU & metering; 11kV/0.433kV kiosk substation; main switchboard adjacent to the kiosk substation & HV and LV conduits, pits & cabling. Package D Specialist wash equipment; these works will be completed by a Specialist Wash Equipment Contractor & includes wash equipment replacement; water recycling facility & wash equipment operating system

Full information about NORMANBY CAR WASH FACILITY (NCWF) and other development projects are available with the Cordell Connect subscription

Subscription includes
  • Full access to over 160,000 development projects
  • Over 63,000 industry contacts
  • 1500 hours of research every week
Further Information

Details available with subscription

Request Demo
Type RAIL CORRIDOR/CAR WASH BUILDING
Dev Type Renovation
Status Commenced
Stage CONSTRUCTION
Ownership 3
No. Units 0.000
No. Floors 0.000
Commencement Date 25/09/17
Completion Date 25/05/18
First Reported Date 03/05/17

Project Information

Roles

Get full contact details for those working on the project at this stage

Developer
Cassie White
Tendering Authority
Cassie White
Design Engineer
Civil Engineer
Mechanical Engineer
Contractor
Tenderer

Get full contact details for 1 tenderers on this project

Tenderer

Other Projects

Stay Connected with Cordell Connect

Cordell Connect tracks the lifespan of all Construction, Civil & Mining projects across Australia, naming key roles as they are appointed. This allows you to target and track projects & companies you would like to get involved with and is your one-stop shop for target sales leads in construction.