FREMANTLE COLLEGE

171 Leroy Rd, BEACONSFIELD, Western Australia, Australia. 6162

Estimated Value $244,000

Development College - extn

Main Category Education

  • Early Planning
  • Planning
  • Tenders
  • Construction

About This Project


Autism extension program works at Fremantle College including stage 1 (block f first floor), stage 2 (block d ground floor), block d first floor & student uat amenities. Stage 1 - Block F first floor - New ICT laboratories including the installation of safety barriers, signage, etc. to make the site safe, re-paint all existing painted materials, re-paint existing walls, paint existing ceiling panels & associated exposed grid frame work, removal of any Asbestos Containing Materials (ACM), installation of a new teaching walls inclusive of data & power services, with cabinetry to match the new building works, installation of original computer desks & associated services from Block D. Desks to suit 32 students & 1 Teacher, supply & installation of additional student desks, replacement of the existing damaged or deteriorated floor coverings with new floor coverings, replacement of the existing lighting with new fittings, including emergency lights, installation of new ceiling fans, installation of new air-conditioning services & cleaning of existing window treatments. Stage 2 - Block D ground floor - Refurbishment of room D1 & D2 including installation of safety barriers, signage, etc. to make the site safe, removal of any Asbestos Containing Materials (ACM), remove existing computer tables & associated services, (to be relocated to Block F), re-paint all existing painted materials, re-paint existing walls, paint existing ceiling panels & associated exposed grid frame work, installation of new doors & doorframes, including a new doorway between Room D1 & D2, replacement of an existing damaged or deteriorated floor coverings with new floor coverings, installation of a new Tea Prep/Kitchenette in Classroom D2, replacement of the existing lighting with new fittings, including emergency lights, installation of new ceiling fans, replacement of the existing sliding entrance doors with new aluminium framed swing doors & sidelights, installation of new air-conditioning services & cleaning of existing window treatments. Create a new Sensory Room including, remove existing concrete floor slab, supply & installation of a new reinforced concrete floor slab including termite control, WPM & etc, supply & installation of a new external stud-framed wall & new window in a format to match the adjacent external windows, installation new doors & doorframes, installation new plasterboard linings to internal walls, installation a new suspended acoustic rated ceiling, installation new floor coverings to match floor coverings in adjacent areas, installation new lighting including emergency lights, installation new ceiling mounted EWIS speakers & associated volume control system connected to existing services, installation of new smoke detectors to be connected to the existing FIP & installation of new air-conditioning services. New Office including remove existing concrete floor slab, supply & installation of a new reinforced concrete floor slab including termite control, WPM, etc, supply & installation of a new external stud-framed wall & new window in a format to match the adjacent external windows, installation of new doors & doorframes, installation of new plasterboard linings to internal walls, installation of a new suspended acoustic rated ceiling, installation of new floor coverings to match floorcoverings in adjacent areas, installation of new lighting, including emergency lights & installation of new air-conditioning services. New Veranda/covered way including installation of a new roof structure & extend paving, etc to provide external access to adjacent rooms. Block D first floor - Refurbishment of room D10 including installation of safety barriers, signage, etc to make the site safe, remove existing computer tables & associated services, installation of a new teaching wall inclusive of data & power services with cabinetry to match the new building works, replace existing damaged or deteriorated floor coverings with new floor coverings, installation of new lighting including emergency lights, replace existing ceiling fans, installation new air-conditioning services & cleaning of existing window treatments. Student UAT amenities - Universal accessible amenities including, installation of safety barriers, signage, etc. to make the site safe, provide a shower facility within the existing UAT including in floor drainage & water supply, installation of new floor & wall vinyl & installation of new exhaust system.

Full information about FREMANTLE COLLEGE and other development projects are available with the Cordell Connect subscription

Subscription includes
  • Full access to over 160,000 development projects
  • Over 63,000 industry contacts
  • 1500 hours of research every week
Further Information

Details available with subscription

Request Demo
Type COLLEGE - extn
Dev Type Addition
Status Commenced
Stage CONSTRUCTION
Ownership 3
No. Units 0.000
No. Floors 0.000
Commencement Date 08/06/18
Completion Date 29/06/18
First Reported Date 09/05/18

Project Information

Roles

Get full contact details for those working on the project at this stage

Tendering Authority
Adele Emerson
Developer
Architect
Craig Grundmann
Electrical Engineer
Developer
Builder
Tenderer

Get full contact details for 5 tenderers on this project

Tenderer
Tenderer
Tenderer
Tenderer
Tenderer

Other Projects

Stay Connected with Cordell Connect

Cordell Connect tracks the lifespan of all Construction, Civil & Mining projects across Australia, naming key roles as they are appointed. This allows you to target and track projects & companies you would like to get involved with and is your one-stop shop for target sales leads in construction.