WATERPROOFING THE WEST STAGE 2 UPGRADE

Port Road (btwn Port Rd & Old Port Rd, Queenstown & Park St South), WOODVILLE PARK, South Australia, Australia. 5011

Estimated Value $58.6 million

Development Stormwater drainage

Main Category Public utilities

  • Early Planning
  • Planning
  • Tenders
  • Construction

About This Project


Scope of works & initial investigations. Review of the existing (2010) design & re-design. The existing design & hydraulic model needs to be revisited & revised. The existing design is included in Appendix A. The scope of works is summarised as follows: a) Additional detailed engineering survey & revised engineering design for proposed arterial drains in the Port Rd central median from Old Port Rd, Queenstown to Park St South, Woodville Park: b) Removal of previously proposed detention basins between Old Port Rd & Woodville Rd; c) Extension of car parking in the central median at Botting St, Albert Park as shown in Appendix B. New car park to accommodate 14 additional car parking lots; d) Car parking (opposite Botting St intersection) to be lowered in order to minimise stormwater inundation of Botting St, Lawrence St & Port Rd. Hydraulic modelling is required to demonstrate the effect of using the car park as a detention basin to reduce the effects of storm water inundation around Botting St/Lawrence St & quantify the frequency & depth of inundation of the car park: e) Existing laterals are to be connected to the new arterial drain as conventional drains & not as wet systems. The design of the arterial drain must allow for this; f) Detailed design of three upgraded laterals within the limit of the Port Rd corridor and checks to ensure that the upgrading proposed does not restrict subsequent upgrading of the remainder of each lateral system in the future, to the required standard: g) Deletion of all streetscape works shown in the current plans: h) Revised DRAINS and Tuflow model for the whole catchment to demonstrate pre & post 5 year ARI and 100 year ARI stormwater inundation. Existing DRAINS & Tuflow models will be supplied to the successful tenderer.

Full information about WATERPROOFING THE WEST STAGE 2 UPGRADE and other development projects are available with the Cordell Connect subscription

Subscription includes
  • Full access to over 160,000 development projects
  • Over 63,000 industry contacts
  • 1500 hours of research every week
Further Information

Details available with subscription

Request Demo
Type STORMWATER DRAINAGE
Dev Type Addition
Status Commenced
Stage CONSTRUCTION
Ownership 4
No. Units 0.000
No. Floors 0.000
Commencement Date 15/12/16
Completion Date 15/12/18
First Reported Date 17/09/14

Project Information

Roles

Get full contact details for those working on the project at this stage

Developer
Trevor Ash
Tendering Authority
Trevor Ash
Engineer
Contractor
Tenderer

Get full contact details for 1 tenderers on this project

Tenderer

Other Projects

Stay Connected with Cordell Connect

Cordell Connect tracks the lifespan of all Construction, Civil & Mining projects across Australia, naming key roles as they are appointed. This allows you to target and track projects & companies you would like to get involved with and is your one-stop shop for target sales leads in construction.