BROKEN HILL PIPELINE

Murray River, BROKEN HILL, New South Wales, Australia. 2880

Estimated Value $380 million

Development Pipeline

Main Category Civil engineering

  • Early Planning
  • Planning
  • Tenders
  • Construction

About This Project


Construction of the 270km Broken Hill pipeline. The pipeline will run adjacent to the Silver City Highway between Wentworth & Broken Hill, on the western side of the Darling River. The pipeline's proposed capacity when used in conjunction with the current Broken Hill water supply infrastructure shall be able to meet a peak daily demand of up to 37.4 ML/day. Scope of work includes: river intake consisting of a screened intake structure from the River Murray near Wentworth connected directly to a pump station to deliver raw water into the pipeline to Broken Hill. Low lift pump station and pipeline from the river intake to a water conditioning plant. A water conditioning plant, located at or near Wentworth, if required to meet the Contractor s design requirements from a whole of life perspective. Approximately 270 km of water transfer pipeline from the river intake facility to a bulk water reservoir near Broken Hill. Aeries of in-line transfer pump stations (size, number and location to be determined by the Contractor) along pipeline necessary to deliver raw water to Broken Hill including power supply. HV network mains power transmission lines to power the pump stations and any water conditioning plant. A bulk water storage reservoir to be located at or near Broken Hill. a transfer pump station and associated pipework from the bulk storage to a new terminal raw water storage tank at the existing Mica Street Water Treatment Plant in Broken Hill.

Full information about BROKEN HILL PIPELINE and other development projects are available with the Cordell Connect subscription

Subscription includes
  • Full access to over 160,000 development projects
  • Over 63,000 industry contacts
  • 1500 hours of research every week
Further Information

Details available with subscription

Request Demo
Type PIPELINE
Dev Type New
Status Commenced
Stage CONSTRUCTION
Ownership 3
No. Units 0.000
No. Floors 0.000
Commencement Date 22/01/18
Completion Date 14/12/18
First Reported Date 10/08/16

Project Information

Roles

Get full contact details for those working on the project at this stage

Developer
Raj Rajendran
Tendering Authority
Raj Rajendran
Design Engineer
Contractor
Consultant
Contractor
Tenderer

Get full contact details for 6 tenderers on this project

Tenderer
Tenderer
Tenderer
Tenderer
Tenderer
Tenderer

Other Projects

Stay Connected with Cordell Connect

Cordell Connect tracks the lifespan of all Construction, Civil & Mining projects across Australia, naming key roles as they are appointed. This allows you to target and track projects & companies you would like to get involved with and is your one-stop shop for target sales leads in construction.