HUNTER VALLEY FLOOD MITIGATION

., NELSONS PLAINS, New South Wales, Australia. 2324

Estimated Value $1.2 million

Development Flood restoration

Main Category Civil engineering

  • Early Planning
  • Planning
  • Tenders
  • Construction

About This Project


April 2015 flood damage restoration. Scope of work includes: restoration of an identified section of riverbank along the Hunter River & the Paterson River. Provision of all plant, materials & labour to execute the works. Provide & maintain temporary safety fencing & signage around the works areas to keep unauthorised persons from entering the site as well as rural animals such as cattle; the areas to be fenced include: storage, access tracks, contractors' compound & utilities areas. Construct temporary access roads to suit proposed construction vehicles & maintain the road (both existing & constructed) throughout the life of the project. Remove & lawfully dispose any plants & trees. Excavate existing soil to batter lines. Stockpile or use in filling if it is suitable, otherwise it is to be lawfully disposed of. Supply & place crushed rock of specified size to form rock revetment. Landscape the disturbed areas of the bank. Reinstate private property such as fencing removed in order to carry out the works; restore all private property damaged as a result of the works to its pre-construction condition; this may include the provision of fill material or topsoil & turf to restore the height of the levee. Fill & restore levee to pre-construction levels including turfing.

Full information about HUNTER VALLEY FLOOD MITIGATION and other development projects are available with the Cordell Connect subscription

Subscription includes
  • Full access to over 160,000 development projects
  • Over 63,000 industry contacts
  • 1500 hours of research every week
Further Information

Details available with subscription

Start A Free Trial
Type FLOOD RESTORATION
Dev Type New
Status Firm
Stage CONTRACT LET
Ownership 3
No. Units 0.000
No. Floors 0.000
Commencement Date 27/03/17
Completion Date 25/07/17
First Reported Date 14/09/16

Project Information

Roles

Get full contact details for those working on the project at this stage

Tendering Authority
Ananda Kumarasinghe
Design Engineer
Contractor