YANDRA TERRACE STORMWATER UPGRADE

Yandra Tce, HAYBOROUGH, South Australia, Australia. 5211

Estimated Value $600,000

Development Stormwater drainage

Main Category Public utilities

  • Early Planning
  • Planning
  • Tenders
  • Construction

About This Project


The Principal has the care, control & management of Yandra Tce, Hayborough & proposes to carry out stormwater upgrade works. In broad terms, the scope of works comprises (subject to the foregoing, the works generally include without necessarily being limited to the following): 1) mobilisation of plant, equipment, sheds & labour to site; 2) liaison & cooperation with Council & service authorities; 3) service locating & depthing; 4) identification & protection of existing underground & overhead services & repair of any existing services damaged by the works; 5) coordination with other contractors on site completing doglegs or relocations for service main adjustments; 6) setting out the works from established bench marks & boundaries; 7) installation & maintenance of security fencing around site facilities & active works & trenches etc; 8) soil erosion & drainage management; 9) site clearance of all vegetation, rubbish, internal services, & structures including grubbing out stumps; 10) demolish & dispose of existing pavements & infrastructure (kerb, concrete etc.) off site to a legal dump; 11) dispose of excess trench spoil off site to a legal dump, including any associated environmental testing required; 12) earthworks including but not milted to: swale works, bunds, cut & fill ; 13) Hydroseed to all disturbed surfaces within the swale at completion of works; 14) supply & install new drainage pipes & box culverts; 15) supply & install new junction boxes, side entry pits & headwalls; 16) supply & install GPT; 17) provision for shoring of trenches & pit excavations; 18) adjustments to existing stormwater infrastructure as required; 19) pavement reinstatement as required for Council maintained roads & DPTI specifications for DPTI maintained roads 20) reinstatement of all existing infrastructure affected by the works (eg kerb & gutter, spoon drains, footpaths, fencing, line marking & signage, etc); 21) traffic management (eg safety barriers, signage); 22) maintenance of access & service to existing private property within the project at all times; 23) as constructed survey; 24) CCTV survey; 25) demobilisation of site;

Full information about YANDRA TERRACE STORMWATER UPGRADE and other development projects are available with the Cordell Connect subscription

Subscription includes
  • Full access to over 160,000 development projects
  • Over 63,000 industry contacts
  • 1500 hours of research every week
Further Information

Details available with subscription

Start A Free Trial
Type STORMWATER DRAINAGE
Dev Type New
Status Commenced
Stage CONSTRUCTION
Ownership 4
No. Units 0.000
No. Floors 0.000
Commencement Date 23/02/17
Completion Date 10/06/17
First Reported Date 23/11/16

Project Information

Roles

Get full contact details for those working on the project at this stage

Developer
Dana Bradshaw
Tendering Authority
Dana Bradshaw
Consulting Engineer
Contractor
Trevor Stidston
Tenderer

Get full contact details for 8 tenderers on this project

Tenderer
Tenderer
Tenderer
Tenderer
Tenderer
Tenderer
Tenderer
Tenderer