TWEED HEADS ADMINISTRATION OFFICE

Brett St, TWEED HEADS, New South Wales, Australia. 2485

Estimated Value $600,000

Development Office - rectification - stage 2

Main Category Public buildings & facilities

  • Early Planning
  • Planning
  • Tenders
  • Construction

About This Project


Office rectification works stage 2. Scope of work includes: kitchenette - removal & storage of existing joinery, fittings and fixtures. Demolition works - demolition as required to allow for construction of cleaners cupboard and access ladder. Destructive inspection works - creation of inspection holes as required to allow for assessment of existing wall framing for water damage. Remediate amenities wall framing assess and provide 2 quotations for: Option A: removal of severely damaged sections only, installation of new framing as required and remediation works to retained framing & Option B: removal of all damaged sections of existing wall framing, and installation of new framing as required. Plumbing - installation of new hot and cold water connections for cleaners sink and core floor hole for new cleaners sink drain connection made within the ceiling cavity of Level 1. Installation of Ladder to Chiller Deck - remove existing stairs to chiller deck, make ready floor substrate as required for installation of new floor covering, supply and install new access step ladder to chiller deck. Walls & ceilings - install new wall framing as shown on drawings including framing for new sliding door to chiller deck ladder. Install wall linings, and doors as noted, new ceilings and access hatches in amenities and make good ceilings in kitchenette and both passageways. Reinstate kitchenette. Electrical replace existing electrical outlets in kitchenette in same locations (existing wiring to be retained); lighting supply including switching, and outlets in amenities area by others. Security - install new security access swipe and suitable door latch to sliding door, integrated with existing system carried out by nominated sub-contractor Christec. Fire - reinstatement of fire sensors and alarm components in Amenities and Kitchenette and installation of new sensors in cleaners cupboard & chiller access ladder rooms to be carried out by nominated sub-contractor. Painting - paint existing rear wall of kitchenette and passageway, along with new walls, skirtings & architraves enclosing new chiller access room & cleaners cupboard; painting required on both sides of the access corridor to ensure balanced and same appearance.

Full information about TWEED HEADS ADMINISTRATION OFFICE and other development projects are available with the Cordell Connect subscription

Subscription includes
  • Full access to over 160,000 development projects
  • Over 63,000 industry contacts
  • 1500 hours of research every week
Further Information

Details available with subscription

Start A Free Trial
Type OFFICE - rectification - stage 2
Dev Type Renovation
Status Commenced
Stage CONSTRUCTION
Ownership 4
No. Units 0.000
No. Floors 0.000
Commencement Date 04/09/17
Completion Date 03/11/17
First Reported Date 22/02/17

Project Information

Roles

Get full contact details for those working on the project at this stage

Developer
Chris Gray
Tendering Authority
Chris Gray
Contractor
Tenderer

Get full contact details for 1 tenderers on this project

Tenderer

Other Projects

Stay Connected with Cordell Connect

Cordell Connect tracks the lifespan of all Construction, Civil & Mining projects across Australia, naming key roles as they are appointed. This allows you to target and track projects & companies you would like to get involved with and is your one-stop shop for target sales leads in construction.