MURRINDINDI SHIRE COUNCIL BRIDGE RENEWAL & UPGRADES

Myles Rd, MURRINDINDI, Victoria, Australia. 3717

Estimated Value $215,000

Development Bridgeworks - renewal & upgrade

Main Category Civil engineering

  • Early Planning
  • Planning
  • Tenders
  • Construction

About This Project


Myles Road 1400m from Murrindindi Road works include supply & replace damaged posts & guard rail along bridge, sand & paint all steel components of the structure with epoxy kill rust paint, supply & replace damaged deck boards & kerb, resurface areas of lost/worn asphalt on both approaches, concrete patching to south west column in centre pier where cracked, remove timber crossheads, pack steel crossheads to provide full bearing between the pile and the crosshead & reinstate timber crosshead. Acheron Road 730m from Maroondah Highway repair settlement to abutment at eastern approach, clean, remove rust and paint all corroded steel components of the bridge, tighten the bolts connecting the deck units to main beams for improved lateral restraint, install steel bands or anti-split bolts through severely split timber piles, excavate to a depth of 1.2m to 1.5m and conduct timber boring to assess the condition of piles below ground level. Webbs Lane 150m from UT Creek Road aupply & place rock beaching on batters and stream bed, 2.5m upstream & downstream to stabilise masonry wingwalls which are loose & leaning slightly outwards, steel bracing & bearers to be cleaned of rust & painted with epoxy kill rust paint. Supply & erect guardrail over entire structure including 12m either side of each approach. Maintongoon Road 2260m from Newmans Road remove all large logs & branches from the waterway, ensure that U-slab bolts are tight to provide effective lateral load distribution (ensuring they are not over tightened), extend asphalt seal to kerbs, carry out concrete patch repairs & crack injection to affected areas, extend guard rail by 12 metres and terminate to current standards, repair damaged sections of existing rail, carry out batter stabilisation works in front of the abutments and around the wing walls, repair minor spot rusting of bracing.

Full information about MURRINDINDI SHIRE COUNCIL BRIDGE RENEWAL & UPGRADES and other development projects are available with the Cordell Connect subscription

Subscription includes
  • Full access to over 160,000 development projects
  • Over 63,000 industry contacts
  • 1500 hours of research every week
Further Information

Details available with subscription

Start A Free Trial
Type BRIDGEWORKS - renewal & upgrade
Dev Type New
Status Firm
Stage CONTRACT LET
Ownership 4
No. Units 0.000
No. Floors 0.000
Commencement Date 05/06/17
Completion Date 22/12/17
First Reported Date 01/03/17

Project Information

Roles

Get full contact details for those working on the project at this stage

Developer
Tendering Authority
Contractor
Sam Clark

Other Projects

Stay Connected with Cordell Connect

Cordell Connect tracks the lifespan of all Construction, Civil & Mining projects across Australia, naming key roles as they are appointed. This allows you to target and track projects & companies you would like to get involved with and is your one-stop shop for target sales leads in construction.