NEPEAN HIGHWAY APARTMENTS
211 & 212 Nepean Hwy, SEAFORD, Victoria, Australia. 3198
Estimated Value $3.5 million
Development Apartments (19) - 3 storey
Main Category Residential
About This Project
Demolition of existing building, excavation and construction of an apartment block consisting of (19) three storey dwellings containing a mix of (1) bedroom plus study and (2) bedroom apartments with balconies, single car space and roof garden deck. It will also have (26) basement car parking, bicycle storage areas, storage areas and a lift. The dwellings will be constructed in two modules. The modules will be attached via the use of a central lift and stairwell at the front. A 1.8 metre high rendered block fence will be built across the front of the building and steel auto gates installed. It will also have an energy efficient design with the retention of significant stands of vegetation and will be replanted to consist of 100% locally indegenous species. External colours will be non reflective. WSUD principles are to be incorporated and will include on-site stormwater detention, rain water tanks, stormwater harvesting, re-use of stormwater for garden watering and toilet flushing etc and on-site bio-treatment to reduce contaminants. Materials used for construction will be brick, metal cladding, natural steel ballustrades, clear glass ballustrades, folded steel facades, stained timber screening, stained timber cladding, aluminium window frames, rendered finish to concrete block, and metal cladding.
Full information about NEPEAN HIGHWAY APARTMENTS and other development projects are available with the Cordell Connect subscription
Subscription includes- Full access to over 160,000 development projects
- Over 63,000 industry contacts
- 1500 hours of research every week
Details available with subscription
Request DemoType | APARTMENTS (19) - 3 storey |
---|---|
Dev Type | New |
Status | Commenced |
Stage | CONSTRUCTION |
Ownership | 1 |
No. Units | 19.000 |
No. Floors | 0.000 |
Commencement Date | 15/04/17 |
Completion Date | 14/06/18 |
First Reported Date | 17/02/10 |
Project Information

Other Projects
MAXWELL STREET UNITS | $2.700 million | UNITS (9) - 5 storey | NEW FARM |
VINCENTS ROAD TELECOMMUNICATIONS FACILITY | $250,000 | TELECOMMUNICATIONS FACILITY | NUDGEE |
NEWHAVEN STREET UNITS | $3.600 million | UNITS (12) - 3 storey | EVERTON PARK |
TRIABUNNA DISTRICT SCHOOL | $5.500 million | School - altns & addns | TRIABUNNA |
BUNBURY YOUTH PRECINCT | $450,000 | YOUTH PRECINCT | BUNBURY |
WOODBRIDGE DISTRICT SCHOOL | $3.500 million | School - redevelopment | WOODBRIDGE |
BETKA BEACH SEAWALL | $400,000 | SEAWALL | MALLACOOTA |
QT SYDNEY | $1.300 million | ROOF - altns | SYDNEY |
GINGIN DISTRICT HIGH SCHOOL | $500,000 | HIGH SCHOOL - remediation works | GINGIN |
AUSTIN ROAD DWELLINGS | $1.500 million | DWELLINGS (11) | SOMERVILLE |
Stay Connected with Cordell Connect
Cordell Connect tracks the lifespan of all Construction, Civil & Mining projects across Australia, naming key roles as they are appointed. This allows you to target and track projects & companies you would like to get involved with and is your one-stop shop for target sales leads in construction.