BODANGORA WIND FARM

Gillinghall Rd, BODANGORA, New South Wales, Australia. 2820

Estimated Value $163 million

Development Wind farm

Main Category Public utilities

  • Early Planning
  • Planning
  • Tenders
  • Construction

About This Project


Construction and operation of a wind farm with up to 33 wind turbines each with a generating capacity of between 2.0 and 4.0 MW and a total installed capacity of up to 113 MW. Associated infrastructure including access tracks, local road infrastructure upgrades, electrical connections between the turbines and a new substation, temporary and permanent meteorological masts, gravel pit, a temporary concrete batching plant, and an operations and maintenance facility. Grid connection would be through a new substation connecting to the existing 132 kV transmission line between the Wellington substation and Beryl.

Full information about BODANGORA WIND FARM and other development projects are available with the Cordell Connect subscription

Subscription includes
  • Full access to over 160,000 development projects
  • Over 63,000 industry contacts
  • 1500 hours of research every week
Further Information

Details available with subscription

Request Demo
Type WIND FARM
Dev Type New
Status Firm
Stage CONTRACT LET
Ownership 1
No. Units 0.000
No. Floors 0.000
Commencement Date 03/07/17
Completion Date 30/12/18
First Reported Date 17/11/10

Project Information

Roles

Get full contact details for those working on the project at this stage

Landscape Architect
Developer
Frank Boland
Designer
Frank Boland
EIS Consultant
Greg Vincent
Acoustic Engineer
Contractor

Other Projects

Stay Connected with Cordell Connect

Cordell Connect tracks the lifespan of all Construction, Civil & Mining projects across Australia, naming key roles as they are appointed. This allows you to target and track projects & companies you would like to get involved with and is your one-stop shop for target sales leads in construction.