ENCOUNTER LAKES MECHANICAL GATE WORKS

Nicolas Baudin Dr, ENCOUNTER BAY, South Australia, Australia. 5211

Estimated Value $400,000

Development Mechanical gate lifting mechanisms (4) - fabricate & install

Main Category Public utilities

  • Early Planning
  • Planning
  • Tenders
  • Construction

About This Project


The Principal has the care, control & management of the Encounter Lakes Control Structure on Nicolas Baudin Dr (Site) & proposes to replace the mechanical gate lifting mechanisms for all four (4) gates. In broad terms the scope of works comprise: 1) Site Preparation & Equipment Survey: a) Establishment of site in public area & implementation plan; b) Site & equipment survey to confirm all critical gate dimensions; MECHANICAL - c) Fabrication & installation of Gate Lifting Mechanism (4-off); d) Fabrication & installation of Gate Drive Covers (4-off); e) Modifications to the existing Gate & Guide frame to suit new lifting mechanism; STRUCTURAL - f) Supply & installation of chemical anchor connection points for the new drive frame; g) Fabrication & Installation of new secondary plate lid sections, including locking plate; h) Modifications to the concrete lids as required; i) Modifications to Concrete weir structure for structural support of equipment; ELECTRICAL - j) Upper & Lower limit proximity switches, including PLC logic modifications; k) Position monitoring proximity switch, including PLC logic modifications; l) Field Junction boxes to facilitate re-use of existing power & control cables; m) Energy meters & programming, enabling remote monitoring over Ethernet; n) Replacement of Ethernet switch.

Full information about ENCOUNTER LAKES MECHANICAL GATE WORKS and other development projects are available with the Cordell Connect subscription

Subscription includes
  • Full access to over 160,000 development projects
  • Over 63,000 industry contacts
  • 1500 hours of research every week
Further Information

Details available with subscription

Start A Free Trial
Type MECHANICAL GATE LIFTING MECHANISMS (4) - fabricate & install
Dev Type New
Status Firm
Stage CONTRACT LET
Ownership 4
No. Units 0.000
No. Floors 0.000
Commencement Date 16/03/17
Completion Date 16/06/17
First Reported Date 23/11/16

Project Information

Roles

Get full contact details for those working on the project at this stage

Developer
Dana Bradshaw
Tendering Authority
Dana Bradshaw
Consulting Engineer
Electrical Engineer
Contractor
Tenderer

Get full contact details for 2 tenderers on this project

Tenderer
Tenderer

Other Projects

Stay Connected with Cordell Connect

Cordell Connect tracks the lifespan of all Construction, Civil & Mining projects across Australia, naming key roles as they are appointed. This allows you to target and track projects & companies you would like to get involved with and is your one-stop shop for target sales leads in construction.