WADEYE & MANTHATHPE WATER PROJECTS

Communities of Manthathpe &, WADEYE, Northern Territory, Australia. 0822

Estimated Value $1.699 million

Development Water mains/water source equipping

Main Category Public utilities

  • Early Planning
  • Planning
  • Tenders
  • Construction

About This Project


Wadeye asbestos mains replacement - scope of work includes: construction of approximately 2,575m of new PVC-O PN16 water supply reticulation mains including hydrants, tees, valves and other fixtures, to replace existing asbestos cement (AC) water mains; connect properties to the new water main in a manner that maintains services with minimal disruptions; disconnect and plug the existing AC mains adjacent to the new water mains including the removal of any AC mains that cross above or beneath the new water supply mains & appropriate handling and disposal of all removed AC pipe. Manthathpe new water source equipping - scope of work includes: equip existing bore RN37354 with new bore pump, pipework, electrical control panels, power supply cabling and conduits; construct a new bore compound including but not limited to clearing works, sealed access road and compound, bore manifold concrete slab and fencing; construct approximately 30m of DN100 & 770m of new DN150 PVC-O rising main from the bore to the Manthathpe water storage compound; construct new water storage compound inlet production pipework manifold with mag-flow meter & valves; construct underground connection pipework within the Manthathpe water storage compound to connect the existing bore manifold to the production manifold and from the manifold to the ground level tank and bypass lines; install new flow meter conduit and cabling to the production manifold; install new conduits and extend hypochlorite dosing lines to the new production manifold from the existing bore head; connect the dosing lines to the new manifold and confirm correct operation; maintain disinfection of the water supply during changeover to the new supply infrastructure. PWC will supply the Miri unit to be installed within the bore control panel by the contractor prior to factory acceptance testing

Full information about WADEYE & MANTHATHPE WATER PROJECTS and other development projects are available with the Cordell Connect subscription

Subscription includes
  • Full access to over 160,000 development projects
  • Over 63,000 industry contacts
  • 1500 hours of research every week
Further Information

Details available with subscription

Request Demo
Type WATER MAINS/WATER SOURCE EQUIPPING
Dev Type New
Status Commenced
Stage CONSTRUCTION
Ownership 3
No. Units 0.000
No. Floors 0.000
Commencement Date 14/08/17
Completion Date 27/04/18
First Reported Date 17/05/17

Project Information

Roles

Get full contact details for those working on the project at this stage

Developer
Liam Trieu
Tendering Authority
Liam Trieu
Contractor
Andre Tayler
Tenderer

Get full contact details for 4 tenderers on this project

Tenderer
Tenderer
Tenderer
Tenderer