DEVIATION ROAD STORMWATER DRAINAGE

Deviation Rd, NARACOORTE, South Australia, Australia. 5271

Estimated Value $800,000

Development Stormwater drainage

Main Category Public utilities

  • Early Planning
  • Planning
  • Tenders
  • Construction

About This Project


Construction of stormwater drainage. Scope of work includes: excavation & construction of all the storm water drains including bedding, backfilling & construction of all pits & appurtenances. Reinstatement of all pavements, verges, footpaths, kerbs, structures & other items affected by the works including the connection of all property stormwater connections, existing irrigation etc. Verge reinstatement to be a 100mm layer of top soil & seeded. Construction of footpaths, kerbs, pram ramps & other concrete works. soil erosion & drainage management during construction. Clean-up & demobilisation. Connection of all existing storm water pipes to new system if existing system is to be removed. Storm water drainage pits, grates, covers, pipe work, culverts, swales & rock scour. Complete demolition & disposal of existing pavement, kerb & footpath. Removal & disposal of redundant stormwater pipelines & structures. Supply & installation of new stormwater pipelines & associated pipe structures. Supply & installation of property storm water outlets including connection of existing & any modification & relaying to achieve the required falls. Works from the Moyhall Road Basin up to & including 2 lengths of 450 pipe past Pit D3. These lengths are to be boarded up with a steel plate & concreted in place for future connection. Cutting & connection into the existing system as detailed at Pit I1.

Full information about DEVIATION ROAD STORMWATER DRAINAGE and other development projects are available with the Cordell Connect subscription

Subscription includes
  • Full access to over 160,000 development projects
  • Over 63,000 industry contacts
  • 1500 hours of research every week
Further Information

Details available with subscription

Request Demo
Type STORMWATER DRAINAGE
Dev Type New
Status Commenced
Stage COMPLETED
Ownership 4
No. Units 0.000
No. Floors 0.000
Commencement Date 27/10/18
Completion Date 27/11/18
First Reported Date 18/07/18

Project Information

Roles

Get full contact details for those working on the project at this stage

Tendering Authority
Daniel Willsmore
Developer
Daniel Willsmore
Civil Engineer

Other Projects