SILVERTON WIND FARM

Barrier Ranges, approx 25km north west of, BROKEN HILL, New South Wales, Australia. 2880

Estimated Value $450 million

Development Wind farm - remaining stages

Main Category Public utilities

  • Early Planning
  • Planning
  • Tenders
  • Construction

About This Project


The Proposal will involve the construction & operation of a large-scale wind farm. The Proposal includes: up to 488 wind turbines, each with three blades mounted on a tubular steel tower and a generator transformer inside or adjacent to each tower; electrical connections between wind turbines and the site substations using a combination of underground cable & overhead concrete, timber or steel pole power lines; site substations to convert from reticulation voltages (22 66kV) to medium voltages (66 220kV) for connection with the transmission switchyard; an onsite transmission switchyard that includes high voltage transformers & switchgear for connecting the output of the wind farm to offsite transmission lines; new 24 kilometre transmission line connecting the transmission switchyard with TransGrid s existing Broken Hill; substation (20 kilometres off site); new 305 kilometre transmission line connecting the transmission switchyard with SP-Ausnet s existing Red Cliffs substation in Victoria (301 kilometres off site); onsite control and maintenance buildings, including storage facilities for equipment, materials and spares and workers facilities building; internal access tracks, hardstand areas and other associated infrastructure required for the construction, installation and maintenance of the wind farm; & minor upgrades to site access via the Silverton Road, Eldee Station Road and Daydream Mine Road. Additional temporary construction infrastructure would be required during the construction and refurbishment or decommissioning phases.

Full information about SILVERTON WIND FARM and other development projects are available with the Cordell Connect subscription

Subscription includes
  • Full access to over 160,000 development projects
  • Over 63,000 industry contacts
  • 1500 hours of research every week
Further Information

Details available with subscription

Request Demo
Type WIND FARM - remaining stages
Dev Type New
Status Commenced
Stage COMPLETED
Ownership 1
No. Units 0.000
No. Floors 0.000
Commencement Date 20/03/17
Completion Date 09/02/19
First Reported Date 10/10/07

Project Information

Roles

Get full contact details for those working on the project at this stage

Landscape Architect
Andrew Homewood
Acoustic Engineer
Gustaf Reutersward
Consultant
Nick Graham-Higgs
Developer
Neil Cooke
Civil Engineer
Contractor

Other Projects

Stay Connected with Cordell Connect

Cordell Connect tracks the lifespan of all Construction, Civil & Mining projects across Australia, naming key roles as they are appointed. This allows you to target and track projects & companies you would like to get involved with and is your one-stop shop for target sales leads in construction.